Meter Swaps Require Licensed Coordination With PG&E
A meter swap means removing and replacing the utility meter base. Property owners need this work when they upgrade a panel, replace a damaged or outdated meter, or fix an issue PG&E has flagged. Whenever the meter base itself is being changed, moved, or upgraded in capacity, PG&E must inspect the work and re-energize the connection before power comes back on. This is not a step we can skip or work around. We need a licensed electrician on this job because PG&E does not permit unauthorized meter work, and skipping the proper process only creates delays, not savings. We're a friendly, family-run crew that handles meter swap projects in San Ramon every week, and we manage the PG&E coordination directly so property owners don't get stuck waiting on hold with the utility.
Licensed C10 Contractor. Lic# 881560. Serving San Ramon and the East Bay since 2005.
How a Meter Swap Gets Scheduled and Signed Off
1. You call or request an estimate.Give us a call or submit a request, and we'll confirm whether the job needs a full meter base replacement or a simpler swap.
2. We schedule a site visit. We inspect the existing meter base, confirm the scope of work, and pull any required permit before work begins.
3. We complete the swap and coordinate with PG&E. PG&E must de-energize the connection and later re-energize it, and we handle that coordination directly so you don't have to call the utility yourself.
4. Inspection and sign-off. Once PG&E re-energizes the meter, we confirm the connection is safe and code-compliant before we close out the job.
Meter Swap Questions Answered
Do I need PG&E involved for a meter swap?
Yes. PG&E must de-energize the connection before we replace or upgrade the meter base, then re-energize it once the work passes inspection. We coordinate this directly with PG&E on your behalf, so you never have to call the utility yourself.How long does a meter swap take in San Ramon?
Most meter swaps in San Ramon take one day for the electrical work itself, though PG&E's re-energization scheduling can add extra time depending on their current queue. We give you a realistic timeline once we've confirmed the scope on-site.Do I need a permit for a meter swap?
Yes, most meter base replacements require a permit from the local building authority. We pull the permit as part of the job, so you don't have to navigate the paperwork or the inspection process on your own.Will I lose power during a meter swap?
Yes, power is off for the duration of the swap while PG&E de-energizes the line, typically a few hours. We schedule the work window with you in advance so you can plan around the outage.